I-10(W) to US 290
Segment E

Segment E is a proposed 15.2-mile, four-lane, controlled access toll road with intermittent frontage roads from I-10(W) (the Katy Freeway) near Katy to US 290 (Northwest Freeway) near Cypress through western Harris County.   Segment E opened to traffic in December 2013.  Toll operations began on February 1, 2014.  The 2016 toll rate for Segment E from south of I-10(W) to US 290 is $3.01.  Segment E is operated and maintained by TxDOT.  Information is available at www.txtag.org.

Click here for overview of Grand Parkway Segment E with Google Maps.

To view an overall layout of Segment E, click here. The overall layout map is a large file and may take a few minutes to download. For a low resolution file of the overall layout, click here.

A Recommended Alternative Alignment was identified in the Draft Environmental Impact Statement (DEIS, February 2003). This selection was based on public and resource agency input, and analysis and comparison of the potential effects on the physical, biological, and human environments of each alternative alignment.

Additional information concerning the schedule can be found here.

The Preferred Alternative Alignment is shown above on the map. Click on the individual purple squares to view detailed maps of Segment E. These squares indicate the limits of the detailed maps for this segment. Once a square is selected, the detailed map will open in a separate window. The detailed maps are large files and may take a few minutes to download depending on the speed of your internet connection. Once in the detailed maps, use the zoom button in the toolbar to view the maps at 100% of their original size.

To learn more about the progress of Segment E as well as other segments of the Grand Parkway, please use the blue links to the left. To e-mail your comments for Segment E click here.

Segment E Revised Record of Decision (ROD) was issued on June 9, 2009 by FHWA.

The Segment E Final Environmental Impact Statement (FEIS) Re-evaluation was approved by the Federal Highway Administration on June 9, 2009.

Segment E FEIS Public Comments are addressed in the Segment E Record of Decision (ROD).

Segment E Record of Decision (ROD) was issued on June 24, 2008 by FHWA.

The Segment E Final Environmental Impact Statement (FEIS) was signed by the Federal Highway Administration on November 19th, 2007.

The FEIS has been organized in a four-volume set. Volume I of the FEIS includes analyses and results common to all four segments. Volume II provides a detailed assessment of an individual segment relative to the specific study area. Volume III contains Exhibits and Appendices referenced in Volumes I and II of the FEIS. Volume IV contains public comments.

Prior to opening this document, please right click and "save target as” to your server or hard drive. Due to the size of the file(s) it will time out or lock up your computer if you try to open from this location.

Seg E FEIS Volume_I

Seg E FEIS Volume_II

Seg E FEIS Volume_III

Seg E FEIS Volume_III Exhibits

Seg E FEIS Volume_III Appendices

Seg E FEIS Volume_IV